Royal Commission for Jubail and Yanbu Project
: Integrated Computer Systems for water and sewer facilities.
Project
Summary:
Provide
all required professional services for the detailed integrated design
of instrumentation, control, computer systems, communication network and
electrical power supply features of a Water and Sewer Unified Control
System (WSUCS). The proposed WSUCS will replace the existing control system.
The project scope
of work includes the design, engineering, procurement, construction, testing,
training, operation and maintenance of the Control system as a turnkey
project to monitor and control all water and sewer facilities. The system
is redundant in all its components (i.e. Servers, workstations, network
and instruments)
The
Project includes the following equipment:
- 2 Real time database servers running windows NT enterprise
operating system with clustering
- 2 Relational Database servers running windows NT enterprise operating
system with clustering
- 2 Historical analysis servers running windows NT enterprise operating
system with clustering
- 1 Departmental server running windows NT operating system
- 25 High-end Engineering workstations
- 6 High-end workstations
- 10 internal LAN installations in all sites including redundant switches
to connect to Fiber Optic Backbone WAN
- 2* 25 Km (Redundant) Fiber Optic WAN
- Computer peripherals (10 Color laser printers, 2 B/W laser printers,
12 Heavy duty Line printers, storage devices, etc.)
|
|