Projects  

- Royal Commission for Jubail and Yanbu Project : Integrated Computer Systems for water and sewer facilities.

Project Summary:
Provide all required professional services for the detailed integrated design of instrumentation, control, computer systems, communication network and electrical power supply features of a Water and Sewer Unified Control System (WSUCS). The proposed WSUCS will replace the existing control system.

The project scope of work includes the design, engineering, procurement, construction, testing, training, operation and maintenance of the Control system as a turnkey project to monitor and control all water and sewer facilities. The system is redundant in all its components (i.e. Servers, workstations, network and instruments)

The Project includes the following equipment:
- 2 Real time database servers running windows NT enterprise operating system with clustering
- 2 Relational Database servers running windows NT enterprise operating system with clustering
- 2 Historical analysis servers running windows NT enterprise operating system with clustering
- 1 Departmental server running windows NT operating system
- 25 High-end Engineering workstations
- 6 High-end workstations
- 10 internal LAN installations in all sites including redundant switches to connect to Fiber Optic Backbone WAN
- 2* 25 Km (Redundant) Fiber Optic WAN
- Computer peripherals (10 Color laser printers, 2 B/W laser printers, 12 Heavy duty Line printers, storage devices, etc.)

 
Location : Madinat Yanbu Al-Sinaiyah
Total Amount : 16,000,000 SR
more>>
© MOSECO Corporation Saudi Arabia,2003.
All Right Reserved